Water & well intelligence

From one well to a whole network in view.

Monitor water production, pumping activity, quotas and quality trends. Arddata gives well owners a clear mobile view and operators a shared picture across participating wells.

For the well owner
Mobile portal
For the operator
Multi-well dashboard
Core visibility
Production · quotas · quality

The product in use

Start with the well. See across the network.

For the well owner

A clear mobile overview, with dedicated production and quality views. Follow the current pumping session and quota use without searching through multiple dashboards.

For the multi-well operator

A shared view of participating wells: pumping status, flow, production and quota use. Move from network totals to the well that needs attention.

Discuss the measurements and setup for your site →
Arddata™Water intelligence
Well 01Pumping
Current flow rate

107.2m³/h

Last Hour
105m³
Last 24h
2,290m³
Total
51,439m³
TDS
336.7ppm
Current billing cycleWithin quota
Pumped6,342m³
Contract quantity86,400m³
Production progress7%
Product interface preview · illustrative data
Miyahuna

Miyahuna · shared visibility across participating wells

Arddata brings production data from connected meters into pumping-session records and shared production and quota views for operators. Well owners have a dedicated portal to follow their own well.

From meter to well

Follow the measurement down to its source.

Descend from the instrumented wellhead, past the casing and the water table, to the submersible pump at the base of the borehole.

  1. Wellhead and metering

    WH-01 · Surface

    This example places flow measurement at the wellhead, with optional line-pressure sensing according to the project scope.

    • Flow: 42.8 m³/h
    • Line pressure: 3.14 bar

    Pending approval

  2. Telemetry and power

    GW-02 · Surface

    A gateway collects compatible instrument data. Connectivity and power are selected for coverage and conditions at the site.

    • Uplink: LoRaWAN
    • Signal: −78 dBm

    Pending approval

  3. Storage, treatment and distribution

    TK-03 · Surface

    Storage and downstream measurement points can be included in the monitoring scope where suitable instruments are installed.

    • Tank level: 76.2%
    • Conductivity: 1.28 mS/cm

    Pending approval

  4. Casing and riser column

    CS-07 · 50 m

    The casing and riser show the physical path of the water. The readings shown do not establish the structural condition of the well.

    • Casing: DN 200 · example
    • Drop pipe: DN 100

    Pending approval

  5. Water table and drawdown

    WL-11 · 100 m

    Where a level sensor is installed, changes during pumping and recovery can be tracked. Aquifer performance requires qualified interpretation.

    • Static level: −100 m
    • Drawdown: 12 m

    Pending approval

  6. Submersible pump

    P-07 · 150 m

    Pump electrical and operating measurements can be added using compatible instrumentation. These measurements are not included in every installation.

    • Motor current: 18.4 A
    • Speed: 2,940 RPM

    Pending approval

Illustrative engineering cross-section. Depths and readings are examples; equipment is scoped for each project.

Data & measurements

Measurements with an operational context.

Available measurements and update frequency depend on the equipment, connectivity and configuration at each site.

01

Flow & volume

Current flow, cumulative meter readings and production by hour, day and month from the connected meter.

m³/h · m³
02

Pumping sessions

Follow periods of activity, duration, produced volume and average flow within each session.

Status · duration · volume
03

Quality trends

Follow TDS or conductivity where sensors are installed, and review changes over time.

TDS · EC
04

Quotas & billing cycles

Compare production with the configured cycle quota and review remaining volume and projections where quotas are set up.

Production · quota
05

Device status

Review the last received data and available device information to identify sites needing attention.

Last seen · device data
06

Additional instrumentation

Level, pressure or pump measurements can be scoped for the project. Remote control requires suitable equipment and a separate control design.

Site-specific scope

Views for each role

A shared record. The right view for each team.

Access is organized around the organization, workspace and participating wells.

01

Well owner

Production, quality, pumping activity and quota use in a clear mobile portal.

Follow the well
02

Network operator

Compare wells, pumping status and aggregated production in one dashboard.

Compare sites
03

Operations team

Review production history, sessions and quality trends to decide what needs investigation.

Review trends
04

Reporting teams

Review participating-well production and quota use across billing cycles.

Production · quotas

Let’s talk about your project

Plan your next deployment.